On this job all the water pipes for the bathroom were piped under
the bath that we removed for the walk in shower unit. So we had to
re-work the pipe work into the floor to supply the toilet and sink
unit |
The waste pipe for the shower unit was cleverly installed behind
the tiles so not to been seen |
```````````````````````````````````````````````````````````````````````````````` |
|
|
Here we installed a water softener unit for the cold water
supply into the house, this was done when we were making alteration
to the pipe work before we fitted the new units in the kitchen |
This shows a pipe pressure test before we plaster boarded over
the pipe work |
```````````````````````````````````````````````````````````````````````````````` |
|
|
Here we installed an outside tap and made alterations to the soil
pipe to accept a new toilet |
On this job we had to bring up new pipe work into the wall to supply
the shower, we made this out of one continuous pipe so to reduce any
possible leaks. |
```````````````````````````````````````````````````````````````````````````````` |